Movement of a 650 kg pump to basement level

Movement of a 650 kg pump to basement level

Movement of a 650 kg pump to basement level in West London Movement of a 650 kg pump to basement level At a site in West London, our team successfully carried out the challenging task of transporting a 650 kg pump down to the basement level. Given the weight and size...
Complex AHU Installation

Complex AHU Installation

Complex AHU Installation: Engineered Lifting Solution at London University Complex AHU Installation: Engineered Lifting Solution at London University At a prestigious London university campus, we successfully executed a complex air handling unit (AHU) installation...
Installation of 6 air source heat pumps at a Kent school

Installation of 6 air source heat pumps at a Kent school

Installation of 6 air source heat pumps at a Kent school Installation of 6 air source heat pumps at a Kent school Using our specialised Boecker crane equipped with our heavy-duty Trak mats, we successfully completed the installation of 6 air source heat pumps at a...
Contract Crane Lift – Hastings

Contract Crane Lift – Hastings

Contract Crane lift – HastingsCareful planning helped to minimise staff disruption and ensure a smooth-running contract lift at the Conquest Hospital, Hastings Contract Crane lift Single day lift (featured). Additional work on site ran for nine months. Hastings, East...